office@halling.at | (+43)(1)604 31 22 | Mo-Fr 08:30 – 14:00 | DE | EN |
2024-01-23 10:33:07

News 2024.01 - The Game Changer

The Game Changer.

For several decades, the bogies of our models were driven by a Mabuchi engine and cardan shafts, and that was a good thing! But there is a better way - much better! The brand new and highly innovative bogie drives from HALLING Modelle are equipped with a small but powerful coreless motor.

Halling

ANT-ALX-197-H0

ANT-ALX-197-H0

The deliberately simple design allows them to be used in a wide variety of models. Whether as a retrofit drive for one of the high-quality static models from HALLING Modelle, as a drive for your own design or a 3D model or as a two-axis micro drive - the possibilities are almost unlimited!

There are four different wheel bases to choose from, each with three gauges. This results in 12 standard drives, each equipped with matching wheel disks. It is also possible to configure the desired drive yourself. All components are also available individually and can be specially assembled when ordering!

3D models of the bogie drives are already available for download at halling.at! Import the drive of your choice into your design programme before you start designing, or check whether the drive could fit into your 3D model!

Download and to the product

Related News

  • SOT-T22-M

    News 2025.08 - The first red electric Salzburger Lokalbahn

    2025-08-20

    The first „Salzburger Lokalbahn“! In July 1907, the ‘Rote Elektrische’ (Red Electric) connection from Salzburg Local Railway Station to Drachenloch station was opened, and shortly afterwards the section of the line from the German border was electrified. As early as its first year of operation, 15 passenger cars were in service. However, the city and local railway also always transported goods, especially marble, sand and cement. In the interwar period, a buffet car was even added to increase the attractiveness of the railway.

    more

  • GOT-T41-M

    News 2025.07 - The first electric Trams in Graz

    2025-08-06

    Back to a new century! The Graz tramway was electrically powered from 1898. The already uniformly green set dates from the years 1900 to 1912 before the open railcars were modernised, windscreens were installed and the lyre bars gradually gave way to the more reliable scissor bars. First individually, later as a set, the Grazer Tramway brought the people of Graz into the city.

    more

  • M-258_259-SET

    News 2025.07 - Buffer stops for H0e/009

    2025-07-21

    Buy three, pay two! Everything has an end, only the model railway layout often has quite a few track ends! In order to do justice to the variety and without claiming to be complete, we present around 20 (!) different, mainly H0e buffer stops!

    more

  • MIX-101

    News 2025.07 - The first E-Locos in Mixnitz – St. Erhard

    2025-07-18

    Back to the past! In February 2025, the narrow-gauge railway returned to HALLING in the form of two blue Mixnitz electric locomotive models. Today, history takes a step back into the past. The narrow-gauge Mixnitz-St. Erhard line, which is only 11 kilometres long, was built in 1913 as part of the development of the magnesite deposits in Breitenau am Hochlantsch. The two electric locomotives ‘Breitenau’ and ‘Hochlantsch’ with the Bo axle arrangement were delivered by AEG in the same year and used for mixed operation of passenger and goods trains.

    more

  • 1021-06

    News 2025.05 - Cog Railway

    2025-06-27

    New rack railway carriages! As promised, we are replenishing our stocks of the fine, small rack railway models from FERRO-TRAIN! But that's not all, we have also taken the liberty of expanding the range. In response to popular demand, there are now also two structurally different observation carriages to match the ‘Type Schafbergbahn’ passenger coach.

    more

  • BLS-RDS-M

    News 2025.05 - S-Bahn Berlin Re-Design

    2025-05-22

    The best S-Bahn ever! The 481/482 series consists of electric railcars for conductor rail operation on the S-Bahn. With around 500 quarter trains, it is the most frequently used series of the S-Bahn Berlin. The first pre-series quarter train was presented to the public in 1996. As part of the ongoing refurbishment of the Longevity Project, it is planned to be in service until the 2030s. Since 2019, S-Bahn Berlin has been overhauling and modernising over three hundred quarter trains.

    more